Project fit assessment

Building Optimization Assessment

Share your building and HVAC system context so the ClimaMind team can review project fit and follow up on next steps.

Estimated time: 3-5 minutes

Building Optimization Assessment

This assessment helps us understand your HVAC energy optimization goals and site conditions so we can review project fit and plan next steps.

Questions marked with * are required.

1. Company name

*

2. Building type

*

3. Existing HVAC system types

*

4. Current BAS / BMS status

*

Is there an existing BAS / BMS?

Is the BAS / BMS software operating normally?

Is the BAS / BMS hardware operating normally?

5. Does the system support low-voltage control, signal acquisition, and control output?

*

6. Variable-frequency drive support

*

Do chillers support variable frequency?

Do pumps support variable frequency?

Do cooling towers support variable frequency?

Do terminal units support variable frequency?

7. Will hardware retrofit be required?

*

8. Metering and sensing readiness

*

Is sub-metering available for major systems?

Can real-time equipment power be provided?

Are key sensing points complete?

9. Is separate deployment by subsystem required?

*

10. Expected energy savings (%)

*

11. Is there an official energy-saving target?

*

12. Would you accept an energy-saving verification test?

*

13. Preferred commercial model

*

14. Is 3-5 years of stable historical electricity data available?

*

15. Preferred control mode

*

16. Please share any other important needs or expectations

Contact information (optional)

Leave a preferred name, email, or phone number if you would like us to follow up.